Our UNIQUE and
THOROUGH
APPROACH
is bringing to life efficient solutions for
permanent reservoir monitoring

Life of Field (4D)

With operational performance since 2003, WGP are able to offer a full acquisition service to maximise oil recovery through reservoir management practices.

In our goal to develop services towards the next generation of energy supplies WGP are currently involved in BP's Valhall LoFS project in the North Sea utilising a PMSS™ system and BP's Chirag Azeria Reservoir Seismic Project (CARSP) in the Caspian Sea.

You can watch our current involvement in the short feature below.

Capabilities

Otherwise known as Time Lapse Seismic or 4D Seismic, WGP offers a full acquisition service for Life of Field Seismic projects.

  • Bespoke survey design
  • Utilisation of Ocean Bottom Cables or Nodes for acquisition
  • Cable installation - Trenched or temporary / portable

Benefits

The benefits of utilising ocean bottom receivers against towed streamer techniques are well versed, and include:

  • Absolute multi-component (4C) repeatability
  • Very quiet environment
  • All source-receiver offsets
  • All azimuths
  • Reduction in seabed multiples
  • Excellent source manoeuvrability
  • Image under the gas
WGP Group, West Street, Kilkhampton, Bude, Cornwall, EX23 9QW, UK.
Tel: +44 1288 322 000 | Fax: +44 1288 322 001 | Email: contact us